All-In Worship Center Renovation Update

August 16, 2018

Posted by Kenneth Bonnett on

It is hard to know where to start, as this is the next to the last update. It is going to be so amazing as we worship together in our renewed Worship Center in just over a week. Next week the chairs will arrive and the final details will be made. As you can see the additional screens have been...

August 9, 2018

Posted by Kenneth Bonnett on

As mentioned in the previous post, this week has been filled with amazing results. The renovated Worship Center is really starting to look like a Worship Center once again. One of the crosses has been installed. There will be an identical one on the opposite side of the stage. You will notice...

August 2, 2018

Posted by Kenneth Bonnett on

Changes over the past week have not been as dramatic as past weeks. This week has been more about the small details in preparing for Paragon 360 to roll in on Friday to start making some major headway. You will see in the photo below that all of the LED lights have been hooked up and are working...

July 26, 2018

Posted by Kenneth Bonnett on

The renovations are really starting to come together this week. We know that many of you were able to see the worship center this past weekend for "Standing On The Word", but the crew has really turned the corner and is installing many of the finishing components. This week, Paragon 360, our...

July 19, 2018

Posted by Kenneth Bonnett on

The transformation of the Worship Center is happening very quickly and we are starting to see some results that will be visible in the completed renovation. The remainder of the acoustical insulation has been installed around the upper sections of the Worship Center. Even before a single chairs...

July 12, 2018

Posted by Kenneth Bonnett on

The renovation team has been hard at work again this week. It is amazing to see the progress that they make each week. This week, all of the stage lighting has been removed from the trusses and are ready to be shipped out. These will be replaced with energy efficient LED lights that will produce...

July 5, 2018

Posted by Kenneth Bonnett on

It appears that the construction has moved beyond the major demolition phase to the reconstruction phase. The structural work that was being done to the stage has been completed and the front stage wall has been rebuilt and concreted in.  The crew is working on preparing the ceiling and...

June 21, 2018

Posted by Kenneth Bonnett on

This week the renovation team is mostly done laying the conduit for the communication lines and concreted over most of the trenches. The stage is almost to the point of being reconstructed with the final preparations being made to lay block for rebuilding the front wall. The back wall of the...

June 14, 2018

Posted by Kenneth Bonnett on

The demolition of the stage has been completed and the construction team is working towards installing all conduit for communications lines to the stage area. About 50% of the communications conduit has been laid and will be completed by next week. Once all lines are in place, preparation will...

 