This week the renovation team is mostly done laying the conduit for the communication lines and concreted over most of the trenches. The stage is almost to the point of being reconstructed with the final preparations being made to lay block for rebuilding the front wall. The back wall of the...

June 14, 2018

Posted by Kenneth Bonnett on

The demolition of the stage has been completed and the construction team is working towards installing all conduit for communications lines to the stage area. About 50% of the communications conduit has been laid and will be completed by next week. Once all lines are in place, preparation will...

June 7, 2018

Posted by Kenneth Bonnett on

This week, the crew has almost completed the stage demolition. All of the stairs from the front of the stage and the entire choir loft was removed. The workers have cut and dug communication trenches to lay out the new wiring for the Worship Center.  Continue to pray for great progress...

 

© 2018 First Baptist Church Naples   |   3000 Orange Blossom Drive, Naples, FL US 34109

103901609